NATIONAL RAIL MUSEUM,NEW DELHI
 
BOMBAY RAILWAYS DOCUMENTARY
PART 1
 


BOMBAY RAILWAY DOCUMENTARY

PART 2






BOMBAY RAILWAY DOCUMENTARY
PART 3



 

BOMBAY RAILWAY DOCUMENTARY
PART4


 
BOMBAY RAILWAY DOCUMENTARY 
PART5

INDIAN RAILWAY FLASH:1

  
Locomotives in India consist of electric and diesel locomotives. Steam locomotives are no longer used, except in heritage trains. Locomotives are also called locos or engines.
The Bengal Sappers of the Indian Army were the first to run a steam locomotive in India. The steam locomotive named ‘Thomason’ ran with two wagons for carrying earth from Roorkee to Piran Kaliyar in 1851, two years before the first passenger train ran from Bombay to Thane in 1853. The steam engine is presently exhibited at Roorkee Railway Station.

INDIAN RAILWAY FLASH:2



 The history of rail transport in India began in the mid-nineteenth century. In 1849, there was not a single kilometer of railway line in India. By 1929, there were 41,000 miles of railway line serving every district in the country. At that point of time, the railways represented a capital value of some 687 millions sterling, and they carried over 620 millions of passengers and approximately 90 million tons of goods each year.


  • Digg
  • Del.icio.us
  • StumbleUpon
  • Reddit
  • RSS

BOMBAy RAILWAYS DOCUMENTARY



BOMBAY RAILWAY DOCUMENTARY                                          

                                                                                                     

  • Digg
  • Del.icio.us
  • StumbleUpon
  • Reddit
  • RSS

NILGIRI HIMALAYANS RAILWAY


  • Digg
  • Del.icio.us
  • StumbleUpon
  • Reddit
  • RSS

KALKA-SHIMLA RAILWAYS


  • Digg
  • Del.icio.us
  • StumbleUpon
  • Reddit
  • RSS

Darjeeling himalaya railways 6


  • Digg
  • Del.icio.us
  • StumbleUpon
  • Reddit
  • RSS

Darjeeling himalaya railways 5


  • Digg
  • Del.icio.us
  • StumbleUpon
  • Reddit
  • RSS

Darjeeling himalaya railways 4


  • Digg
  • Del.icio.us
  • StumbleUpon
  • Reddit
  • RSS

Darjeeling himalaya railways 3


  • Digg
  • Del.icio.us
  • StumbleUpon
  • Reddit
  • RSS

Darjeeling himalaya railways 2

  • Digg
  • Del.icio.us
  • StumbleUpon
  • Reddit
  • RSS

Darjeeling himalaya railways(documentary)


                                               LOCOMOTIVES

Current

Steam
All the steam locomotives currently in use on the railway are of the "B" Class, a design built between 1889 and 1925. A total of 34 were built but by 2005 only 12 remained on the railway and in use (or under repair).
In 2002 No.787 was rebuilt with oil firing. This was originally installed to work on the same principle as that used on Nilgiri Mountain Railway No.37395. A diesel-powered generator was fitted to operate the oil burnerfeedwater heater. The overall result was a dramatic change in the appearance of the locomotive.However, the trials of the locomotive were disappointing and it never entered regular service. In early 2011 it was in Tindharia Works awaiting reconversion to coal-firing. and an electrically-driven feed pump, and a diesel-powered compressor was fitted to power the braking system. Additionally the locomotive was fitted with a
In March 2001, No.794 was transferred to the Matheran Hill Railway to allow a "Joy Train" (steam-hauled tourist train) to be operated on that railway. It did not, however, enter service there until May 2002.
                              Diesel
Four diesel locomotives are in use Nos.601-2,604 & 605 of the NDM6 class transferred from the Matheran Hill Railway.


Garratt class D of the Darjeeling Himalayan Railway
In 1910 the railway purchased the third Garratt locomotive built, a "D" class 0-4-0+0-4-0.
Only one DHR steam locomotive has been taken out of India, No.778 (originally No.19). After many years out of use in an American museum, it was sold to an enthusiast in the UK and restored to working order. It is now based on a private railway (The Beeches Light Railway) in Oxfordshire but has run on the Ffestiniog Railway, the Launceston Steam Railway and the Leighton Buzzard Light Railway.

  • Digg
  • Del.icio.us
  • StumbleUpon
  • Reddit
  • RSS

Darjeeling himalaya railways(Animation view)



The Darjeeling Himalayan Railway, nicknamed the "Toy Train", is a 2 ft  (610 mm) narrow gauge railway from New Jalpaiguri to Darjeeling in West Bengal, run by the Indian Railways.
It was built between 1879 and 1881 and is about 86 kilometres (53 mi) long. The elevation level is from about 100 m (328 ft) at New Jalpaiguri to about 2,200 metres (7,218 ft) at Darjeeling.
TO download this video click Download

  • Digg
  • Del.icio.us
  • StumbleUpon
  • Reddit
  • RSS

Calcutta Trams 2

1928
Kalighat to Baliganj route opened.
1930
Park Circus line extended to Garhiahat Junction.
1941
Rajabazar line extended to Galiff Street.
1943
The Calcutta system was connected with the Howrah section through the new Howrah Bridge in February. With this extension, the total track length reached 42.0 miles (67.59 km).
1951
The government of West Bengal entered into an agreement with the Calcutta Tramways Company, and the Calcutta Tramways Act of 1951 was enacted. The government assumed all rights regarding the Tramways, and reserved the right to purchase the system (with two years' notice) on 1st January 1972 or any time thereafter.
1967
The Government of West Bengal passed the Calcutta Tramways Company (Taking Over of Management) Act and assumed management on 19 July. On 8 November 1976 the Calcutta Tramways (Acquisition of Undertaking) ordinance was promulgated, under which the company (and its assets) united with the government.
1970
The Howrah sections were closed in October; the 1971/1973 Nimtala route was closed down in May 1973, and realignment of the Howrah Station terminus occurred. Total track length was now reduced to 38 miles (61.2 km).
1980
Tram tracks on Bentinck Street and Ashutosh Mukhopadhyay Road closed for construction of the Kolkata metro; following construction, these stretches were not reopened. Overhead wires were present until 1994 on Bentinck Street. Tracks on Jawaharlal Nehru Road remained after realignment, making a new terminus at Birla Planetarium; the Birla Planetarium route closed in 1991. An overpass was constructed on that road in 2006.
1982
The Sealdah Station terminus (along with the Sealdaha - Lebutala stretch on Bipin Bihari Gangopadhyay Street) closed for construction of an overpass. The site is now occupied by Sealdah Court and a bus terminal.
1985
On 17 April, tracks were extended connecting Manicktola to Ultadanga via Manicktola Main road and C. I. T. Road 3.7 km (2.30 mi). This was the first Tramways extension since 1947.
1986
On 31 December, further extension of tram tracks from Behala to Joka was completed.
1992
Calcutta Tramways Company undertook a new venture by introducing bus service from 4 November, initially with a fleet of 40 buses.
1993
Howrah Station terminus closed and tram tracks removed on Howrah Bridge; the cantilever bridge proved too weak for trams. All routes terminated there were shortened to the Barhabazar (Howrah Bridge) terminus (formerly Barhabazar Junction).
1995
High Court terminus closed for reconstruction of Strand Road. Rails and wires were removed from there and from Strand Road, Hare Street and Shahid Kshudiram Basu Road. The site is now occupied by the newest building of the Kolkata High Court.
2004
Garhiahat Depot - Garhiahat Junction link on Gariahat Road closed for construction of the Gariahat overpass.
2006
Mominpur - Behala stretch on Diamond Harbour Road closed for construction of an overpass at Taratala. Initially, there was a plan to route tracks on that overpass after its completion, but the road was later converted to a National Highway and the plan dismissed. The Behala - Joka stretch is still in existence, along with the Behala terminus.
2007
Wattgunge Junction - Mominpur Diamond Harbour Road, Mominpur - Jatin Das Park Judges Court Road, Jatin Das Park - Kalighat Shyama Prasad Mukherjee Road, Kalighat - Ballygunge Station Rash Behari Avenue and Kalighat - Tollygunge S. P. Mukherjee Road, Deshapran Sashmal Road routes closed for reconstruction. As of early 2011, they have not yet reopened.
2008
Galiff Street terminus realigned. Irregular service from Bagbazar to Galiff Street converted to regular by Route 7/12. Rails and wires removed from part of Bidhan Sarani route (restored by end of year).
2009
Tracks on R. G. Kar Road from Shyambazar five-point crossing to Belgatchia tram depot closed down for reconstruction. As of early 2011, they are not yet restored.

  • Digg
  • Del.icio.us
  • StumbleUpon
  • Reddit
  • RSS

Calcutta Trams 1


                                                                                                                                                                           The Calcutta Tramways Company (1978) Limited (CTC) is a West Bengal, India government-run company which runs trams in Kolkata (formerly known as Calcutta) and buses in and around Kolkata. The Kolkata tram is the oldest operating electric tram in Asia, running since 1902.
1873
An attempt was made to run a 2.4-mile (3.9 km) tramway service between Sealdah and Armenian Ghat Street on 24 February. The service was not adequately patronised, and was discontinued on Nov 20.
1880
The Calcutta Tramway Co. Ltd was formed and registered in London on 22 December. Metre-gauge horse-drawn tram tracks were laid from Sealdah to Armenian Ghat via Bowbazar Street, Dalhousie Square and Strand Road. The route was inaugurated by the Viceroy, Lord Ripon, on 1 November.
1882
Steam locomotives were deployed experimentally to haul tram cars. By the end of the nineteenth century the company owned 166 tram cars, 1000 horses, seven steam locomotives and 19 miles of tram tracks.
1900
Electrification of the tramway, and reconstruction of tracks to 4 ft 8 12 in (1,435 mm) (standard gauge) was begun.
1902
The first electric tramcar in Asia ran from Esplanade to Kidderpore on 27 March, and on 14 June from Esplanade to Kalighat.
1903
The Kalighat line was extended to Tollygunje, the Esplanade line to Belgachhia (via Bidhan Sarani, Shyambazar), and the Esplanade to Shialdaha route (via Binay Badal Dinesh Bag, Rajib Gandhi Sarani and [present] Mahatma Gandhi Road) opened.
1904
Esplanade to Bagbazar route through College Street opened.
1905
Howrah Station to Bandhaghat route was opened to trams in June. Electrification project completed.
1906
Bowbazar Junction to Binay Badal Dinesh Bag, Ahiritola Junction to Hatibagan Junction routes opened.
1908
Lines to Shibpur via G.T. Road prepared. Esplanade to Shialdaha station via Moula Ali Junction, Moula Ali Junction to Nonapukur, Wattganj Junction to J.Das Park Junction (via Alipur), Mominpur Junction to Behala routes opened.
1910
Shialdaha Station to Rajabazar route opened.
1915
Mirzapur Junction to Bowbazar Junction and Shialdaha Station to Lebutala Junction routes opened.
1920
Strand Road Junction to High Court route opened.
1923
S.C.Mallik Square Junction to Park Circus route (via Royd Street, Nonapukur) opened.
1925
Barhabazar Junction to Nimtala route opened.

  • Digg
  • Del.icio.us
  • StumbleUpon
  • Reddit
  • RSS

INDIAN TRAIN FLASH'S 5

  • Digg
  • Del.icio.us
  • StumbleUpon
  • Reddit
  • RSS

INDIAN TRAIN FLASH'S 4

  • Digg
  • Del.icio.us
  • StumbleUpon
  • Reddit
  • RSS

INDIAN TRAIN FLASH'S 3

  • Digg
  • Del.icio.us
  • StumbleUpon
  • Reddit
  • RSS